Georgia Department of Transportation continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, August 9 through Friday, August 15.
All work is subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers.
Traffic interruptions are listed below by interstates, categories, and counties.
Interstate 95
I-95 North at FL State Line Camden County
St. Marys River Bridge (FDOT) Repairs
Overnight Lane Closures in FL & GA
I-95 South at Exit 87/US 17 Bryan County
Overnight lane closures Aug. 4 prepares for shift
All lane traffic shifts in place
Aug. 15-18 traffic shift reduced to 2 lanes with single lane closure
Bridge maintenance work
I-95 SB & NB at MP 90 - 91 Chatham County
Northbound & Southbound Left Lane Closure
Pouring Concrete Footer for Signs
Nightly Single Lane Closure
I-95 SB & NB at MP 85 – 112 Bryan/Chatham County
North & Southbound Outside Lane Closures
Concrete Work for Sign Improvements
Nightly Sunday – Saturday 7pm – 7am
I-95 NB/ SR 405 Ogeechee River MP 90 – 91 Chatham County
Northbound & Southbound Lane Closure
Bridge Maintenance Rehabilitation
Nightly Weekend Single Lane Closure Friday - Monday 9pm – 6am
Continuous Shoulder Closures – Currently on I-95 Southbound
I-95 Bridge at SR 25/Hwy 17 Bryan County
NB Right Lane & Shoulder Closing
Nightly Lane Closures 9pm – 5am
I-95 South MP 46 - 48 McIntosh County
Nighttime Lane Closures
Roadway Maintenance
Thru Aug 2025
I-95 South MP 44.5 Glynn County
Nighttime Lane Closures
Roadway Maintenance
Thru Aug 2025
I-95 North & South MP 91 - 92.2 Chatham County
Nighttime Lane Closures
Roadway Maintenance
Thru Aug 2025
I-95 MP 65 – 86.13 Liberty/Bryan Counties
Jones Rd. Overpass to Rail Road Bridge just south of Exit 87
Nightly lane closures 7 PM till 6 AM
Asphalt Resurfacing
Interstate 16
I-16 EB & WB Under Chatham Parkway Bridge Chatham County
MP 163.5 - 161.5
Daily Single Lane Closure
Chatham Parkway Bridge Over I-16 Chatham County
MP 47.42 - 47.72
Daily/Nightly Lane Closures (Nightly Closures Only Once School Starts Back)
Working on Corrective Items and the Upcoming Polymer Overlay
Beginning Friday 7/25/2025 - 8/31/2025
I-16 Milepost 94.38 – 111.43 Candler County
Candler/Emanuel County Line) to MP 111.43 (Bulloch/Candler County Line)
Nightly lane closures 7:00 PM till 6:00 AM
Concrete Repairs
Interstate 516
I–516 EB & WB at MP 6 to MP 4 Chatham County
From Louisville Rd to Tremont Rd
Bridge Maintenance on I-516
Continuous Nightly Lane Closures/Weekend
9pm - 5am Monday - Sunday
5/10/2025 - 8/31/2025
Bridge & Road Closures with Detours
Lewis Frasier Rd @ Peacock Creek Liberty County
Lewis Frasier Rd to Bill Carter/Dave Williams Rd
150-Day Road Closure for Bridge Replacement
Detour via Lewis Frasier Rd., US 17 and US 84
Bridge Construction, Rehabilitation, and Maintenance
SR 204 @ Forest River Chatham County
Bridge Rehab
EBL/WBL, Nightly Lane Closures 7pm - 6am
EBL/WBL, Continuous Lane Closure 9pm Friday to Monday 5am
Expected Completion 4th Quarter 2025
SR520/US82 @ College Creek Glynn County
Bridge Maintenance/Rehab
Nightly Lane Closures 7pm - 6am
Expected Completion 4th Quarter 2025
US 84/SR 38 at Doctors Creek Long County
From Maple Road NE to Austin Lane SE (MP.0 to 2.00)
WB Bridge Replacement Project
On-site Detour Begins Thurs., Aug. 8
WB Median Crossover Detour
Signal Lane Traffic in Both Directions on Eastbound Bridge
US 84/SR 38 at Satilla River Pierce/Ware Counties
Northside of Bridge Closed to Traffic for Replacement
Single Lane Traffic in Both Directions on Southside of the Bridge
SR 38/US 84 @ Little McMillan Creek Wayne County
Median Crossover Detour with Lane Closure
7/9/25 - 4/3/26
SR 520 MP 20.95 - 21.1 Glynn County
Nighttime Lane Closures
Roadway Maintenance at Bridge
*Thru August 2025
Resurfacing
SR 38/SR 119 (MP 8.23 to MP .20) Liberty County
From East Wallace Dr to West of SR 119
Nightly Lane Closures 7pm – 5 am
Sunday - Thursday
SR 38/ US 84 Wayne County
Resurfacing
From Sunset Blvd to SR 23
Nightly Lane Closures 7pm - 6am
7/13/25 - 9/30/25
SR 117 Telfair County
From SR 27/US 341 to Telfair County Line Rd.
Daily Lane Closures for Resurfacing 7am - 7pm
7/7/25 - 12/31/25
SR 122 Clinch County
From Lanier County Line to the Ware County Line
Daily Lane Closure/Flagging Operation for Asphalt Resurfacing
Monday – Friday 7am – 6pm
7/20/25 - 11/30/25
SR 73/US 301 Bulloch County
From SR 46 to Langston Chapel Road
Daily Lane Closures for Resurfacing
Monday – Saturday 7AM - 7PM
7/22/2025 - 8/18/2025
SR 73/US 301 Bulloch County
From Langston Chapel Road to Tillman Road
Nightly Lane Closures for Resurfacing
Monday – Friday 7pm - 7am
8/18/2025 - 8/31/2025
Other Traffic Interruptions
SR 24/East Main Street Bulloch County
(All work performed by City of Statesboro)
SR 24/East Main Street at MP 0.25 prior to intersection with SR 26/US 80
SR 24/East Main Street Road Closure with Signed detour for replacement of culvert under East Main Street
Closure with detour begins 8/11/25. Reopened by 8/29/25
(City of Statesboro will notify locals and make public announcements)
SR 25/Burnsed Blvd Chatham County
US 80/Burnsed Blvd and SR 25/Brampton Rd
Road Widening, Asphalt Leveling & Paving Operations
Daily Lane Closures
US 80/SR 26/Ogeechee Rd Chatham County
From Victory Dr to Tremont Rd (MP 16.27 to MP 18.00)
Utilities Work Needed from Liberty Pkwy to Horizon Pkwy
Daily/Nightly Lane Closures
Road Widening/Paving Operations/Bridge Demolition
Bridge Construction Over CSX Railroad
SR 25 Glynn County
Yacht Road to Harry Driggers Blvd
Daily Lane Closures with Flagging Operation
Monday - Friday 9am - 4pm and 6pm - 7am
Expected Completion 3rd Quarter 2026
SR 25 Glynn County
Harry Driggers Blvd to SR 99
Daily Lane Closures with Flagging Operation
Monday - Friday 9am - 4pm and 6pm - 7am
Expected Completion 3rd Quarter 2026
SR 30 at Benton Blvd Roundabout Chatham County
Daily Shoulder Closures on Eastbound Shoulders of SR 30 and Roundabout at New Effingham Parkway Intersection
Closure for Installation of Drainage Pipe for Effingham Parkway
Monday through Friday 9am – 4pm
SR 38/ SR119 Liberty & Long Counties
Liberty County Bypass Long Co (MM 13.0- Liberty MM 0.6)
Widening & Reconstruction of Freight Route on SR 38 Bypass
Daily Lane Closures
SR 32 Bacon/Coffee Counties
MP 2 – MP 3
Passing Lane Construction
Daily Lane Closures with Flagging Operation
Monday - Friday
US 1/SR 4 Bypass Project Toombs County
US 1 Detoured onto US 1 Bypass & Connector
TWO (2) New All Way STOP Intersections
From Green Oak Rd to Scarlett Rd
From July 8 until US 1 Bypass Project Completion
Advisory: Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.