Southeast Georgia Road Work Weekly Traffic Interruption Advisory Aug. 9 - 15

GDot

Georgia Department of Transportation continues essential road work throughout Southeast Georgia. As a result, work on construction and maintenance projects will continue Saturday, August 9 through Friday, August 15.  
 
All work is subject to change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones, pay attention and watch for workers. 
 
Traffic interruptions are listed below by interstates, categories, and counties. 
 
Interstate 95  
 
I-95 North at FL State Line                                   Camden County   
St. Marys River Bridge (FDOT) Repairs   
Overnight Lane Closures in FL & GA    
 
I-95 South at Exit 87/US 17                                   Bryan County 
Overnight lane closures Aug. 4 prepares for shift 
All lane traffic shifts in place 
Aug. 15-18 traffic shift reduced to 2 lanes with single lane closure 
Bridge maintenance work 
 
I-95 SB & NB at MP 90 - 91                                   Chatham County   
Northbound & Southbound Left Lane Closure  
Pouring Concrete Footer for Signs 
Nightly Single Lane Closure 
 
I-95 SB & NB at MP 85 – 112                                Bryan/Chatham County 
North & Southbound Outside Lane Closures  
Concrete Work for Sign Improvements 
Nightly Sunday – Saturday 7pm – 7am  
 
I-95 NB/ SR 405 Ogeechee River MP 90 – 91     Chatham County   
Northbound & Southbound Lane Closure  
Bridge Maintenance Rehabilitation  
Nightly Weekend Single Lane Closure Friday - Monday 9pm – 6am 
Continuous Shoulder Closures – Currently on I-95 Southbound 
 
I-95 Bridge at SR 25/Hwy 17                                Bryan County 
NB Right Lane & Shoulder Closing 
Nightly Lane Closures 9pm – 5am 
 
I-95 South MP 46 - 48                                           McIntosh County 
Nighttime Lane Closures 
Roadway Maintenance 
Thru Aug 2025  
 
I-95 South MP 44.5                                               Glynn County 
Nighttime Lane Closures 
Roadway Maintenance 
Thru Aug 2025    
 
I-95 North & South MP 91 - 92.2                          Chatham County 
Nighttime Lane Closures 
Roadway Maintenance 
Thru Aug 2025
 
I-95 MP 65 – 86.13                                      Liberty/Bryan Counties
Jones Rd. Overpass to Rail Road Bridge just south of Exit 87
Nightly lane closures 7 PM till 6 AM
Asphalt Resurfacing
    
 
Interstate 16      
 
I-16 EB & WB Under Chatham Parkway Bridge  Chatham County 
MP 163.5 - 161.5 
Daily Single Lane Closure  
 
Chatham Parkway Bridge Over I-16                   Chatham County 
MP 47.42 - 47.72 
Daily/Nightly Lane Closures (Nightly Closures Only Once School Starts Back) 
Working on Corrective Items and the Upcoming Polymer Overlay  
Beginning Friday 7/25/2025 - 8/31/2025 
 
I-16  Milepost 94.38 – 111.43                               Candler County
Candler/Emanuel County Line) to MP 111.43 (Bulloch/Candler County Line)
Nightly lane closures 7:00 PM till 6:00 AM
Concrete Repairs
 

Interstate 516   
 
I–516 EB & WB at MP 6 to MP 4                          Chatham County 
From Louisville Rd to Tremont Rd                             
Bridge Maintenance on I-516 
Continuous Nightly Lane Closures/Weekend 
9pm - 5am Monday - Sunday 
5/10/2025 - 8/31/2025 
 
 
Bridge & Road Closures with Detours  
 
Lewis Frasier Rd @ Peacock Creek                   Liberty County  
Lewis Frasier Rd to Bill Carter/Dave Williams Rd 
150-Day Road Closure for Bridge Replacement  
Detour via Lewis Frasier Rd., US 17 and US 84 
 
 
Bridge Construction, Rehabilitation, and Maintenance  
 
SR 204 @ Forest River                                        Chatham County   
Bridge Rehab  
EBL/WBL, Nightly Lane Closures 7pm - 6am 
EBL/WBL, Continuous Lane Closure 9pm Friday to Monday 5am     
Expected Completion 4th Quarter 2025  
 
SR520/US82 @ College Creek                             Glynn County 
Bridge Maintenance/Rehab                                                                                                   
Nightly Lane Closures 7pm - 6am 
Expected Completion 4th Quarter 2025 
 
US 84/SR 38 at Doctors Creek                            Long County  
From Maple Road NE to Austin Lane SE (MP.0 to 2.00)   
WB Bridge Replacement Project 
On-site Detour Begins Thurs., Aug. 8 
WB Median Crossover Detour  
Signal Lane Traffic in Both Directions on Eastbound Bridge 
 
US 84/SR 38 at Satilla River                                Pierce/Ware Counties 
Northside of Bridge Closed to Traffic for Replacement 
Single Lane Traffic in Both Directions on Southside of the Bridge 
 
SR 38/US 84 @ Little McMillan Creek                 Wayne County   
Median Crossover Detour with Lane Closure 
7/9/25 - 4/3/26 
 
SR 520 MP 20.95 - 21.1                                        Glynn County 
Nighttime Lane Closures 
Roadway Maintenance at Bridge 
*Thru August 2025 
 
 
Resurfacing  
 
SR 38/SR 119 (MP 8.23 to MP .20)                       Liberty County 
From East Wallace Dr to West of SR 119 
Nightly Lane Closures 7pm – 5 am 
Sunday - Thursday  
  
SR 38/ US 84                                                        Wayne County 
Resurfacing  
From Sunset Blvd to SR 23 
Nightly Lane Closures 7pm - 6am 
7/13/25 - 9/30/25 
 
SR 117                                                                   Telfair County 
From SR 27/US 341 to Telfair County Line Rd. 
Daily Lane Closures for Resurfacing 7am - 7pm 
7/7/25 - 12/31/25 
 
SR 122                                                                   Clinch County 
From Lanier County Line to the Ware County Line 
Daily Lane Closure/Flagging Operation for Asphalt Resurfacing 
Monday – Friday 7am – 6pm 
7/20/25 - 11/30/25 
 
SR 73/US 301                                                        Bulloch County 
From SR 46 to Langston Chapel Road 
Daily Lane Closures for Resurfacing  
Monday – Saturday 7AM - 7PM 
7/22/2025 - 8/18/2025 
 
SR 73/US 301                                                        Bulloch County 
From Langston Chapel Road to Tillman Road  
Nightly Lane Closures for Resurfacing  
Monday – Friday 7pm - 7am 
8/18/2025 - 8/31/2025 
 
 
Other Traffic Interruptions    
 
SR 24/East Main Street                                        Bulloch County 
(All work performed by City of Statesboro) 
SR 24/East Main Street at MP 0.25 prior to intersection with SR 26/US 80 
SR 24/East Main Street Road Closure with Signed detour for replacement of culvert under East Main Street 
Closure with detour begins 8/11/25.  Reopened by 8/29/25 
(City of Statesboro will notify locals and make public announcements) 
                                                           
SR 25/Burnsed Blvd                                            Chatham County  
US 80/Burnsed Blvd and SR 25/Brampton Rd  
Road Widening, Asphalt Leveling & Paving Operations  
Daily Lane Closures  
 
US 80/SR 26/Ogeechee Rd                                  Chatham County 
From Victory Dr to Tremont Rd (MP 16.27 to MP 18.00) 
Utilities Work Needed from Liberty Pkwy to Horizon Pkwy 
Daily/Nightly Lane Closures  
Road Widening/Paving Operations/Bridge Demolition   
Bridge Construction Over CSX Railroad  
 
SR 25                                                                     Glynn County  
Yacht Road to Harry Driggers Blvd 
Daily Lane Closures with Flagging Operation  
Monday - Friday 9am - 4pm and 6pm - 7am   
Expected Completion 3rd Quarter 2026 
 
SR 25                                                                     Glynn County  
Harry Driggers Blvd to SR 99 
Daily Lane Closures with Flagging Operation  
Monday - Friday 9am - 4pm and 6pm - 7am   
Expected Completion 3rd Quarter 2026 
 
SR 30 at Benton Blvd Roundabout                    Chatham County 
Daily Shoulder Closures on Eastbound Shoulders of SR 30 and Roundabout at New Effingham Parkway Intersection 
Closure for Installation of Drainage Pipe for Effingham Parkway 
Monday through Friday 9am – 4pm 
 
SR 38/ SR119                                                        Liberty & Long Counties 
Liberty County Bypass Long Co (MM 13.0- Liberty MM 0.6) 
Widening & Reconstruction of Freight Route on SR 38 Bypass 
Daily Lane Closures 
 
SR 32                                                                     Bacon/Coffee Counties  
MP 2 – MP 3  
Passing Lane Construction 
Daily Lane Closures with Flagging Operation  
Monday - Friday 
 
US 1/SR 4 Bypass Project                                   Toombs County 
US 1 Detoured onto US 1 Bypass & Connector  
TWO (2) New All Way STOP Intersections 
From Green Oak Rd to Scarlett Rd 
From July 8 until US 1 Bypass Project Completion  
 
Advisory: Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.

Return to Grice Connect